Before the construction of the new 40,298-SF facility could occur, demolition of an existing 60,000-SF building was completed. The new distribution facility features 24 exterior docks and one drive-in door with a 24′ clear height. The 2.75 acre site provides parking for 32 cars and 29 trailer storage spaces. Under an aggressive construction schedule, the new facility was constructed from start to finish in 5 months.