This 80,000-SF call center features office, one exterior dock, one drive-in door and parking for 536 cars for repeat client, Comcast.

The project scope details include the installation of:

  • Two (2) redundant 15-ton Liebert units with web-based DDC control systems
  • 300 KVA backup generator with 400 amp transfer switch
  • 160 KVA, 480v UPS with 10 minutes of back-up
  • single mode and multimode optical fiber, CAT 3-100 pair cable and required data racks, ladder racks and cable management; Testing was also completed prior to facility opening.
  • Structured cabling for 500-seat call center via cable trays and walker duct
Square
Footage
80,000
Market
Sectors
R&D Laboratory | Mission Critical
Corporate Office | Interiors
Architect
Gromatzky Dupree & Associates
Footer Contact Image